A lot more of less…
Less is more
Better to have a little of excellence than an abundance of mediocrity.
Shortline Inspiration: Update on North Stratford
I have previously mentioned the North Stratford Railroad Corporation, and in a discussion on interchanges on RMWeb, I posted an abbreviated history plus a diagrammatic view of the station.

Although this represents a specific location, there are general principles at play here. Although the interchange track appears to be of limited length, only coping with 6 cars, that figure refers to the unencumbered track, clear of any turnouts. In practice, the CNR can drop off more cars (empty 40′ box cars and some feed in hoppers for Agway at Coleford), pushing them down the tail end of the former MEC trackage, as long as their own power does not go off its own track. Any local traffic for the short spur near the depot needs to be switched by the NSRC.
Similarly, an arriving NSRC train can come in on the main, run round, then push its full loads onto the empties, and pull them clear of the interchange, putting them into the NSRC loop if necessary, before placing its train of full boxcars (and any empty hoppers) onto the interchange road. If necessary, it may need to use the recently acquired train to push the loads clear of the turnout for the CNR to collect, without going onto the track itself (I am sure blind eyes were turned at times!)
The NSRC ran once a week, but on two days. I know that sounds odd, but on a Tuesday, the loaded boxcars were switched away from the plant, and replaced with empties that were waiting. On Wednesday, they took the loads down to North Stratford, coming back with empties which were placed ready for the next week.
In MEC days it was simpler, as the branch train came up the CNR making use of trackage rights.
In any era, this presents interesting operating potential, and with the CNR served by storage loops and the NSRC by a couple of storage roads, it would make for an interesting oval layout in its own right, whether for the prototype roads, era and location or for anything else.
Personality
In a round-robin Email between a small group of friends (whom I like to think of as “The Unusual Suspects”) Matt LaChance, not even speaking in his mother tongue, came out with several superb insights, not least of which was this:
I’m still looking for my personal approach to this [for the] Temiscouata project even though I know deep inside all the key ingredients are there. Making a good layout right now would be easy, but making it a special layout with personality, that is something else. I have a blurry vision in my mind, I can almost feel on my neck the slightly chilly wind that sweep the St. John’s River valley, but have yet to translate it on the canvas.
Now, isn’t that a grand, poetic way to view the creation of a Model Railway?
That’s my emphasis, but what a great phrase, “a special layout with personality”.
When you think about it, isn’t that what precisely (and yet indefinably) defines a great layout?

You must be logged in to post a comment.